P6 .7 Web Access
Forum TopicHai If anyone of you Have P6.7 Web access Manual & installation Procedure plz mail to my mail id [email protected] Regards Anbin
Hai If anyone of you Have P6.7 Web access Manual & installation Procedure plz mail to my mail id [email protected] Regards Anbin
On my project,I want to prepare a report for monthly distributed count for Engineering Work Packages(EWPs).One EWP is represented by one activity. Total count is the activity count planned for each project calendar month during the length of project...
Need a little guidance and also my first post!!I have a live project currently thats working 6 normal dayshifts.Due to client instructions, the programme is being delayed and client wants to instruct acceleration. They want 2 options for a 16hr worki...
Hello All, I have worked in fossil fuel industry in project controls for several years but now I am in the Nuclear Power Plants industry. Anyone out here have any experience in planning Start-up Integration? Particularly in Instrumentation and Con...
Has any of you worked using software tools that connect the data between MS Project and SAP, especially for material control on the procurement portion of the schedule?. My understanding is that you run this tool and the data in MS Project is updated...
Suppose you will develop a level 3 EPC schedule. At what level do you load resources in a schedule?
Hi Planners, Can Any one tell me how I can install SDK for P6. Thanx
hi, I m working as piping design engineer for last 5 years till date.Now I m getting the opprtunity to work with project dept at planning engineer level for oil & gas sector in my organsiation as projets dept require the Planning engineer with pipin...
Are there any wildcards that can be used in global change? In other words if you want to pick out a word of an activity description and change that word, can you use *,!,# as wildcards? I've tried this an can not get them to work, but I'm wondering...
I would like to know if there is a way to print the schedule without the rolled up (summarized) WBS bars showing.
The schedules I am currently working on have both resources and expenses assigned to activities. In order to be able to track approved cost modifications to the project, I assigned cost accounts to both resources and expenses. I was expecting, it wou...
Good Morning to all planners as you know about long shift in construction work, there is many disadvantage in long shift in Long-term, please if any one have good reference to submit to project manager, I will be thankful best regards jihad aldaoud...
Dear all, I would like to talk about a method I developed about Work Breakdown Structure: the 3D WBS. The idea is that there are 3 dimensions by project phase. Engineering Task = Discipline x Functional Systems x Activity or (Discipline x SBS x ABS) ...
Dear Superiors,Can any one assist me on the above subject Please ! I have a Labor type Resource Name – Dozer Operator whose Budgeted Units are = 464.Non labor type Resource Name – Dozer who’s Budgeted Units are = 0.Here my question is !! Is there...
In construction planning in primavera do we use negative float? If yes why ? please any one can explain and anser this question for my understanding
There are a range of options for the calculation of dates and float in a CPM network. I’ve just finished a draft White Paper focusing on the basic calculations and would appreciate comments on the correctness of the calculations and the methodology a...
There are a range of options for the calculation of dates and float in a CPM network. I’ve just finished a draft White Paper focusing on the basic calculations and would appreciate comments on the correctness of the calculations and the methodology a...
Hi Guys, I'm having a problem deleting projects inside primavera. Im using P6.2.1 Im deleting this because I want to create disk space inside the Data Base. the event code PRMDB-3725-4 keeps popping up everytime I try to delete existing projects and ...
I have P6 stand alone application on my laptop,Recently its taking 20 mins to load after signing in, and then around 20 minutes to load each project Before i fire the laptop through the nearest window is there anyone out there who would know what the...
Hi-Experts. I am using P6 Ver-7. I want see planned progress for next 2 weeks or 2 months, I have baseline vs current project , which is showing Planned progress % vs Actual progress % for current months only. there is any way to see planned prog...