P6 dont support necking on summary band. The work around is to create a WBS Summary Task and apply the necking then filter only WBS Summary Task as sample below:
Hi Rodel,
Thanks very much for reply.
It can show neck in the bar when its not collapsed.
I wanted to show it on the bar even when it collased.
Like, 1 WBS have 4 actvities. When you collapsed it, shows 4 diffrent bars in a same line. I want to show neck on those collapsed bars.
Thanks.
Kind Regards,
Kinnar
Kinnar,

View-> Bars and under Bar Settings tab mark the Bar necking required and if mark Show Bar when collapse on Group Band settings as shown below.