Bridge Construction Schedule

S
Samer Zawaydeh 👤 Member for 17 years 11 months

Dear Abdallah,



It is better to create your own depending on the type of bridge that you have. Basically, you will have the following sections:



1. Material Submittals.

2. Shop drawings.

3. Procurement

4. Construction

I. Excavation



II. Substructure

a.Blinding

b.shuttering

c.Reinforcement/ concreting

d.Deshuttering

e.Concrete protection.

f.Backfil



III. Superstructure

a.shuttering

b.Reinforcement/ concreting

c.Deshuttering

d.Surface protection (paint, if any)



IV. Deck

a.shuttering

b.Reinforcement

c.EM services installation

d.concreting

e.Deshuttering



V. Wearing surface

a.asphating

d.demarcation paint

c.signage

d.electrical works

e.mechanical works



I hope that the general information above will help. If you have a specific question, please let us know.



Samer

Forum Sponsor

Top Posters

Aidar Kurmantayev
0 posts
Noe Radovan
8 posts
GeoVe
0 posts
James Williams
74 posts
Johannes Vandenberg
14 posts
Soheil Barekat
4 posts
Peter Holroyd
51 posts
Neil Atkinson
5 posts
Trian Asmoro
1 posts
Erkan Polater
9 posts