Bridge Construction Schedule
Forum Sponsor
Top Posters
Aidar Kurmantayev
0 posts
Noe Radovan
8 posts
GeoVe
0 posts
James Williams
74 posts
Johannes Vandenberg
14 posts
Soheil Barekat
4 posts
Peter Holroyd
51 posts
Neil Atkinson
5 posts
Trian Asmoro
1 posts
Erkan Polater
9 posts
Dear Abdallah,
It is better to create your own depending on the type of bridge that you have. Basically, you will have the following sections:
1. Material Submittals.
2. Shop drawings.
3. Procurement
4. Construction
I. Excavation
II. Substructure
a.Blinding
b.shuttering
c.Reinforcement/ concreting
d.Deshuttering
e.Concrete protection.
f.Backfil
III. Superstructure
a.shuttering
b.Reinforcement/ concreting
c.Deshuttering
d.Surface protection (paint, if any)
IV. Deck
a.shuttering
b.Reinforcement
c.EM services installation
d.concreting
e.Deshuttering
V. Wearing surface
a.asphating
d.demarcation paint
c.signage
d.electrical works
e.mechanical works
I hope that the general information above will help. If you have a specific question, please let us know.
Samer