i want to rate analysis of 2500mm dia pipe making with 20mm thickness Mild steel sheet. with material cost

A
Abhijit Kale 👤 Member for 18 years 11 months

Dear Anu,

The productivity depends upon the time cycle required for completing an activity.

time cycle depends upon, many factors,such as:

1.Diameter of Pipe.

2.Man power deployed

3.Equipemnt deployed.

4. Location and climateic conditions



you have given to little information in your querry.



At least mention the diameter of pipe.