i want to rate analysis of 2500mm dia pipe making with 20mm thickness Mild steel sheet. with material cost
Dear Anu,
The productivity depends upon the time cycle required for completing an activity.
time cycle depends upon, many factors,such as:
1.Diameter of Pipe.
2.Man power deployed
3.Equipemnt deployed.
4. Location and climateic conditions
you have given to little information in your querry.
At least mention the diameter of pipe.
cheers,
Abhi