Method statement

R
rabbani wgl 👤 Member for 20 years 2 months
A
ashraf alawady 👤 Member for 19 years 10 months

Excelent exeplenation , but i would like to add

*the utilities study and desgin such as(Water, electerical,sewarage , telephon, ....etc)proposed and protection for the existing.

*Planning and rout varifications.

*preoare the contract Bll of Quantities (quantities?& expected cost estimate ).

R
Richard Spedding 👤 Member for 19 years 3 months

Think about how the designers will do their job, or ask them!



Feasibility desk study

Initial route survey

Preferred routes selection

Initial costings

Detailed land survey

Final route selection

Secondary costings

Initial value engineering

Detailed route design

Structures design

Drainage design

Landscaping design

Utilities diversions design / notification

Coordination meetings at regular intervals

Contract document preparation

Final estimate of costs

Value engineering

Tender prequalification notices

Tender period

Review of tenders

Final value engineering

Award of contract




A
Anoon Iimos 👤 Member for 19 years 9 months

conceptual reports, preliminary reports, design criteria, and most of all check your contract!



i’m not an expert!

R
Rodel Marasigan 👤 Member for 19 years 8 months

Use Google and type "Method Statement". There are hips of example and explanation. That’s what I use before.

R
rabbani wgl 👤 Member for 20 years 2 months

Thanks for your suggestion, I tried that. It’s mostly a generic form. What I am looking is a specific list of items to be covered under a Infra structure Design Job.



I am sure, some of the experts may guide us a bit in detail.



Thanks

Forum Sponsor

Top Posters

ahmad rashidi
4 posts
paulciszewski
0 posts
Catalin Suditu
11 posts
Laraib Fatima
0 posts
Adrian Fletcher
12 posts
GeoVe
0 posts
James Williams
74 posts
Abkar Bannayan
25 posts
christiandt
0 posts
J Vaartjes
3 posts