Excelent exeplenation , but i would like to add
*the utilities study and desgin such as(Water, electerical,sewarage , telephon, ....etc)proposed and protection for the existing.
*Planning and rout varifications.
*preoare the contract Bll of Quantities (quantities?& expected cost estimate ).
Think about how the designers will do their job, or ask them!
Feasibility desk study
Initial route survey
Preferred routes selection
Initial costings
Detailed land survey
Final route selection
Secondary costings
Initial value engineering
Detailed route design
Structures design
Drainage design
Landscaping design
Utilities diversions design / notification
Coordination meetings at regular intervals
Contract document preparation
Final estimate of costs
Value engineering
Tender prequalification notices
Tender period
Review of tenders
Final value engineering
Award of contract
conceptual reports, preliminary reports, design criteria, and most of all check your contract!
im not an expert!
Experts please............
Please guide us on this.
Thanks
Use Google and type "Method Statement". There are hips of example and explanation. Thats what I use before.
Thanks for your suggestion, I tried that. Its mostly a generic form. What I am looking is a specific list of items to be covered under a Infra structure Design Job.
I am sure, some of the experts may guide us a bit in detail.
Thanks