Resource/Cost Loading in P3 based on LS and LF

L
Louie Ducut 👤 Member for 22 years 7 months
F
Forum Guest 👤 Member for 17 years 5 months

thanks so much Michael, that’s correct, because I’ve asked the Primavera System and they answer the same.



Good luck.



Louie

M
Michael Byrne 👤 Member for 22 years 8 months

Louie,



I have experienced these problems before in trying to develop late data curves through dumping my data into excel. What I found to work, was to create a copy of my schedule offline (call it LATE or whatever you want), and then run a global change changing all of the early starts to late starts, and all of the early finishes to late finishes. Then simply run your reports as normal (early data is now late data)



Good Luck,



Michael

Z
Zq qz 👤 Member for 23 years 1 month

kABAYAN,

JUST GO TO THE FF MENU:

TOOL , TABULAR REPORTS, RESOURCE, TABULAR THEN ADD.....

IN THE TIMESCALE SELECT THE OPTION YOU WANT.


Forum Sponsor

Top Posters

pennyu
0 posts
James Williams
74 posts
jaasland
0 posts
Doron El
3 posts
Erim INANC
2 posts
gorilpk
0 posts
Ricky
0 posts
pinoyplanner
1 posts
Siddharth Ranadive
1 posts
Aidar Kurmantayev
0 posts