What if you want to delay the start of one resource working on an activity? Yes, it is possible in Primavera P6 Professional to add lag on a resource. Here's how http://ow.ly/nzwu309MjEl
Primavera P6 Professional Resource Lag Quick Tip
Forum Sponsor
Top Posters
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Hi
I need solution for this problem in Primavera.
This is related to Manufacturing Planning works.
Activity A - Machining
Activity B - Machining
Activity C - MAchining
Activity D - Machining
Activity E - Machining
Activity F - Machining.
Machining operation will be done by any on of the machines ( Lathe 1 , Lathe 2 , Lathe 3). After proper link , whether in primavera possible to assign the machines to the activities based on operation which gives better result.
Any one help.
Regards
Ram
Hi
I need solution for this problem in Primavera.
This is related to Manufacturing Planning works.
Activity A - Machining
Activity B - Machining
Activity C - MAchining
Activity D - Machining
Activity E - Machining
Activity F - Machining.
Machining operation will be done by any on of the machines ( Lathe 1 , Lathe 2 , Lathe 3). After proper link , whether in primavera possible to assign the machines to the activities based on operation which gives better result.
Any one help.
Regards
Ram