Washington Group International Planning Manager

Master Planning/Scheduling

•     Used Primavera Project Manager and Microsoft Project to:

o     Track Cost

o     Develop manpower curves for production optimization

o     Implement Work Breakdown Structure ensuring no trade overlap

o     Manage resources and monitor equipment availability

o     Invoice the client based on Earned Value

o     Input daily engineering design submissions into master schedule ensuring construction scheduled had approved design drawings

•     Coordinated with contractors to generate 3 week look ahead schedules

•     Produced weekly schedules with baselines to monitor progress vs. plan



Cost Engineer

•     Responsible for cost accounting for entire projects

o     Weekly reporting of all costs and cost allocation

o     Weekly Estimates At Complete

o     Monthly reports to corporate

•     Used cost data to develop change orders

•     Monitored cost codes to ensure accurate reporting