Planning & Project Control Engineer, AMEC Nuclear Limited, ECW Cast Iron Replacement

START Date

CURRICULUM VITAE (Project Control).





Name:     Mr. Stephen Milburn



Address:     31 Gainsborough Crescent

                 Billingham

                 Stockton on Tees, United Kingdom.

                 TS23 3GA



Telephone No:     07850 938764 (mobile)     01642 864369 (Home)



Date of Birth:     22nd July 1963



Driving Licence:     Full Clean (car owner)



Passport:     10 year valid passport



E-Mail Home:     [email protected]



E-Mail Work: [email protected]

EDUCATION



1975 ~ 1979     Kings Manor Secondary School

     Hall Drive

     Acklam

     Middlesbrough





QUALIFICATIONS ACHIEVED



      GRADE



     G.C.E.          Mathematics     B

     G.C.E.          English Language     B

     G.C.E.          English Literature     B

     G.C.E.          Physics     C

     G.C.E.          Metal Work     A

     G.C.E.          Engineering Drawing     B     

     



QUALIFICATIONS ACHIEVED





     City and Guilds Thermal Insulation Engineering

     City and Guilds Sheet Metal Fabrication

     City and Guilds Microsoft Word Level 2

     City and Guilds Microsoft Excel Level 2.

     



     City and Guilds Information technology

     Planning Supervisors course November 2004

     Institute of Occupational Safety & Health 2004



     

     













Summary



Knowledgeable Planner with almost 5

8 years experience of project procedures, from optioneering and design engineering through to construction, refurbishment and commissioning. Career progression from Planning Assistant to current role as Project Control Engineer, with wide ranging knowledge of all major disciplines; engineering life cycle design, procurement, civil, mechanical, electrical & C & I systems. Varied cross-market experience of Process and Power generation including coal fired & combined cycle gas/steam turbine plants. Ability to work at all levels producing detailed information and analysis from site level to executive reporting.





Skills & Achievements



     Competent and knowledgeable in the use of -

     Microsoft project 2003, 2007, 2010

     Primavera P3e – Project Planner for the Enterprise V7 – P102 – Basic Course

     Primavera P3e – Project Planner for the Enterprise V7 – P106 – Advanced Topics



     Conversant with a wide range of cross-discipline software packages including MS Excel, MS Access, Capable of integrating and linking with planning specific software.



     Creating detailed level 3/4 schedules from engineering documents and base information.



     Following project life cycles from optioneering through to project close out.



     Tracking changes and analyzing critical path networks and variance in work scope.



     Creating resource loaded, logic linked schedules containing several thousand activities from basic engineering documents and client specifications.



     Daily/Weekly progress monitoring and analysis of key project areas highlighting potential problems and re-scheduling in response to resolve and rectify.







EMPLOYMENT HISTORY









June 2006-Present EDF Energy Ltd / AMEC

Hartlepool / Hunterston B / Heysham Nuclear Power Stations.





Position: Project Control Engineer

Duties: Currently employed at British Energy for the projects division

Planning & cost control using P3e V7. Recently completed

A project for the construction, delivery & storage of 275Kv

Generator Transformer from AREVA. Completion of the B main

Fractured Cast Iron Pipe work Failure Programme. Previously engaged

With the development programme for upgrading the Stack Sampling Equipment.

Previously engaged with the development programme for the upgrade of the Stator

Water Chemistry Control Equipment. Currently engaged with the ECW Cast iron

Program to replace all the supply & discharge cooling water lines with carbon

Steel, due to the lines suffering from graphitic corrosion. This involved project control

Monitoring progress & costs through the construction phase of installation of major

Civils construction of underground trenches to accommodate 24” carbon Steel

Glass flake lined pipes through to commissioning & close out of the project.









Jan 2004~June 2006     C+D Environmental Services LTD

                                  63 Portland Street

                                  Mansfield Woodhouse

                                  Mansfield

                                  Notts

                                  NG19 8BE



Position:      Estimator/ Planner

Duties:      Employed at Sellafield British Nuclear Fuels

               Costing and planning for all maintenance work relating

               To insulation, asbestos removal and surveying of all

               Sellafield associated buildings within the BNG group.

               Duties also include the production of required method

               Statements and risk assessments.







Nov 2002 ~ Dec 2003     Interserve Industrial Services

                                   Unit 24 Davy Road

                                   Skippers Lane Industrial Estate

                                   Middlesbrough

                                   TS6 6RU





Position:          Planning Supervisor

Duties:            Planning of labour and materials at Killingholme Power Station.

                     Permit to Work Acceptor

                     Production of relevant Method Statements and Risk

                     Assessments to the client.











Sept 2002 ~ Nov 2002     Interserve Industrial Services



Position:          Planning Supervisor

Duties:            Planning supervisor at Texaco (Pembroke) for

                     Cryogenic insulation of gas sphere.

                     Permit to Work Acceptor

                    Control of labour and materials







Dec 2001 ~ Sept 2002     Interserve Industrial Services



Position:          Sheet Metal Fabricator

Duties:            Metal fabrication for nationwide contracts

                     Fabrication and on-site measuring for Teesside

                     Fabrication shop.









Apr 2001 ~ Dec 2001     Western Thermal Insulation

     Leeds



Position:          Sheet Metal Fabricator

Duties:            Cladding of ductwork at Glaxo Smith & Kline global

                     Headquarters, London







Apr 1999 ~ Apr 2001     Interserve Industrial Services



Position:          Sheet Metal Fabricator

Duties:            Fabricating metal for nationwide contracts.

                      Insulation supervisor at Zeneca, Huddersfield.

                      Supervisor for local shutdown contract – ICI Wilton.







Feb 97 ~ Apr 99     Cape Industrial Services

                            2nd Avenue

                           Tyne Tunnel Trading Estate

                            North Shields



Position:          Sheet Metal Fabricator (Newcastle & ICI Wilton)

Duties:            Fabricating metal fittings for nationwide contracts.

                     On site workshop supervisor (THC Hartlepool, Liverpool

                     Bay project)

                     Relief site supervisor for ICI Wilton shutdown maintenance works.







Jan 96 ~ Feb 97:     Chieftain Insulation

                             Killingworth

                             North Shields



Position:                Insulation Engineer

Duties:                  Insulation of offshore modules; pipe work and vessels

                           Installing industrial fire protection to offshore modules





Aug 82 ~ Jan 96     G & H McGill Insulation



Position:                 Insulation Engineer

Duties:                   Insulation of offshore modules; pipework and vessels

                            Using various types of insulation and metal cladding finishes.







Sept 79 ~ Aug 82     Cape Industrial Services



Position:                   Apprentice Insulation Engineer

Duties:                     Served a 4 year apprenticeship on ICI Wilton and

                              Progressed to site supervisor on DuPont Nylon Works, control & deployment of labour to manage              periodic outages





References – Paul Nurden VT Services

E mail [email protected]



Paul Jenkins Director – Performance Project Solutions 07792 217258

E mail [email protected]



Paul Clewes Head of project control for British Energy

E mail [email protected]



Ken Cook AMEC Senior Project Manager & site lead Hartlepool Nuclear

Power Station.

E mail [email protected]