Hi all.
I need help on the productivity calculation for structural steel works
How many manpower we should consider for how many tonnage.
Now i have 700ton steel beams and column. It is for the construction of 6 floor factory expansion. The duration is 6month
I need to calculate on the manpower.
Please give me some guidance
Thank u so much in advance
| 2.00 | Steel Fixer | Reinforcement Steel | 4.00 | 8.00 | 1.00 | ton | 0.13 Ton/Manday |