Productivity Calculation for Steel Works

Hi all.

I need help on the productivity calculation for structural steel works

How many manpower we should consider for how many tonnage.

Now i have 700ton steel beams and column. It is for the construction of 6 floor factory expansion. The duration is 6month

I need to calculate on the manpower.

Please give me some guidance

Thank u so much in advance

 

 