MS Project Copy Tables and Formulae between Projects

Hi Team,

I have created a table to do some analysis that I want to be available to all my projects and eventually available to the whole enterprise.

I have copied the table view into the Global field and it is available in other projects now that is good.

However when opening up this table view in other projects there are a few number fields I have created with formulea in them, there columns do not copy accross correctly and the formulae has gone, I can manually add the formulae back in by copying the field.

But to make it easy for other users is there a way to ensure these fields with formulae copy accross correctly.

Thanks

Phil

B
Bogdan Leonte 👤 Member for 13 years 10 months

Hello,

you also have to copy the fields with formulae in the global template and then each user has to transfer it back from the global template.

Best regards,

Bogdan

Forum Sponsor

Top Posters

Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts