I think just because of security issues every time updating patches would be a nuisance certainly to planners. May be Primavera should have a tie-up with Microsoft incorporating both of their patches together and release it to end user.
I have to disagree with your comments, as a planner we should keep up to day with our knowledge and same for techonlogy. How many patch is Window XP had ... if you are not keep up to day you are @ risk. How long does it take to update a patch 10min may be.
We are planner, manageing time is our expertise, if we cannot manage 10 min who can.
Sorry to jump on you guys but I think ignorance is not the right answer to problem.
It sounds like this may be related to a bug in a recent Microsoft Windows security patch (KB891781). Users with this Windows security patch would have the problem. If the error generated is "Event code NSIS-2739-6", this is your problem. Microsoft confirmed this is a defect. You have 2 course of action
1. Remove the Windows security patch update through add/remove programs. It will be referenced by the name KB891881.
2. Install a patch Primavera provided to work around this issue. This is available for 3.5.1, 4.0, and 4.1. You do not need to upgrade to 4.1. Search for dhtmled.ocx on the knowledge base and you should find this.
Thanks Alex, but my program is already in a stand alone mode.. where can I get or download the latest patch? If I will upgrade my version 4.0 to 4.1 will this problem be solve? or do I still need the patch even if it has been upgrade?
There is a lot to be said for P3, and a couple of other programs. If I had to spend my life installing patches and the like to keep a program stable, I would hate it, as I need the time the help control the project. Why waste time and money on programs that are problematic.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Alex,
I think just because of security issues every time updating patches would be a nuisance certainly to planners. May be Primavera should have a tie-up with Microsoft incorporating both of their patches together and release it to end user.
HTH
Daya
Philip and Bill
I have to disagree with your comments, as a planner we should keep up to day with our knowledge and same for techonlogy. How many patch is Window XP had ... if you are not keep up to day you are @ risk. How long does it take to update a patch 10min may be.
We are planner, manageing time is our expertise, if we cannot manage 10 min who can.
Sorry to jump on you guys but I think ignorance is not the right answer to problem.
Cheers
Alex
thanks guys..
Christian,
It sounds like this may be related to a bug in a recent Microsoft Windows security patch (KB891781). Users with this Windows security patch would have the problem. If the error generated is "Event code NSIS-2739-6", this is your problem. Microsoft confirmed this is a defect. You have 2 course of action
1. Remove the Windows security patch update through add/remove programs. It will be referenced by the name KB891881.
2. Install a patch Primavera provided to work around this issue. This is available for 3.5.1, 4.0, and 4.1. You do not need to upgrade to 4.1. Search for dhtmled.ocx on the knowledge base and you should find this.
Regards,
Bill
Thanks Alex, but my program is already in a stand alone mode.. where can I get or download the latest patch? If I will upgrade my version 4.0 to 4.1 will this problem be solve? or do I still need the patch even if it has been upgrade?
There is a lot to be said for P3, and a couple of other programs. If I had to spend my life installing patches and the like to keep a program stable, I would hate it, as I need the time the help control the project. Why waste time and money on programs that are problematic.
Hi
Have you installed the latest patch yet?
Some of my users have the same problem and once the patch installted its become stable.
Try to reinstall the client application or stand alone
Cheers
Alex