I am trying to export the entire cost account ID into excel. It appears as if primavera only takes the end value of the ID. So if I have a cost acount ID 00A.01 it will only export 01. Is there any way around this?
P6 Not Exporting Full Cost Account ID
Forum Sponsor
Top Posters
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts
you can try report.
* create a "activity resource and role assignments" report to include the cost account column
* run the report and save to an ASCII Text File
* import the file into Excel
Yes. The cost account ID only exports the end value so 316.0.10.4 will only export .4
I dont know how to format the cost account ID to get a successful re-import. I am exporting to excel.
so you are exporting Resources and Resource assignments ?
then you are exporting resource id and and cost account id ?
and resource type ?
I have a few versions of P6 on different machines, but none as old as 7.0
I would advise downloading an evaluation of version 18 PPM, and checking it with an import of your project.
I checked the admin preferences and both items you specified were set to the maximum. Also, I am using version 7.0.
do you have the rights to do this ?
what version of p6 are you using ?
in the data limits what are your cost account tree maximim level set to ?
in your ID Lenghts what are your cout account ID maximim characters set to ? The maximum is 20 make sure that is set to that
works for me...