Schedule Performance Index in P6

I'm in the process of rebaselining my projects and our management decided to implement SPI with the new baseline. As the revised baseline should show SPI of 1.00 (earned = planned or whatever earned is planned), I made the SPI equal to 1.00 by using the  percent complete calculated from the Schedule percent complete column in the physical percent complete column (This makes my earned = planned and therefore SPI = 1.00). But in reality the physical percent complete is much lesser than the schedule percent complete. I'm not clear if to match these percent completes now (so that SPI becomes 1.00) and rebaseline the project and at the next month update reflect the actual physical percent complete and bring the SPI way less than 1.00 (may be 0.60). I assume this is not an intelligent strategy. Could anyone guide me through?

Thanks,

Mohan

Z
Zoltan Palffy 👤 Member for 16 years 10 months

it is what it is if it is .60 then so be it why are try to manipulate it ?

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts