Why use start instead of early start when filtering

A
Ahmet Tuter 👤 Member for 13 years 3 months

In Primavera, they told me that using Start criteria instead of Early start (and then using data date range) is preferred. Why do we not use Early start within a range but not Start?

D
David Kelly 👤 Member for 21 years 7 months

The "Start" field will contain the levelled start if you have levelled.  Whereas (as long as you have the correct option ticked in the levelling options) Early Start will continue to contain the forward pass result after levelling. So they can be different.

T
Tom Boyle 👤 Member for 19 years 6 months

The Start field is accurate for all activities, while Early Start is only accurate for future activities.

The Start field takes the value of Actual Start when it exists and Early Start when it doesn't.  Early Start never reports an Actual Start date.  Under Retained Logic, Early Start rides the Data Date regardless of progress; under Progress Override or Actual Dates, it is blank if an Actual Start exists.

Makes no difference as long as the schedule is un-progressed or you are only interested in future work.  

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts