Scope Management

Hi all,

in order to define scope of the project, we need to define the requirements and it might be all the requirements are in the sope or we might identify some of the requirements to be included in the scope. Two questions i have:

1- what is the best tool to collect the requirements? i heard about "Requirements Traceability Matrix RTM" and if any one have a real example about it.

2- why we explled some requiremnets though we collect them in th efirst stage?

best,

muataz

Z
Zoltan Palffy 👤 Member for 17 years

every type of work is different so depending on your type of work you will have minmum requirements that are on evry project that you do. You use this minimum requirement matrix as the baisis for starting and then add the project specifics to it based on that particular project. 

if is it electrical design and cosntruction you will always have power load calculation requirments, lighting calculations, single line drawings, switch gear submittals etc. 

Featured Partner

Top Posters

mxsiegel
0 posts
Mattvtek
0 posts
Gareth Evans
3 posts
PP Admin
3, 129 posts
Rajkamal Tangirala
5 posts
Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts