When we want to link several activities of similar type to define a sequence we need to manually link one by one. like FS if we have an option to choose whatever a relation type to be considered as default by the program, we can complete the task simply. In my housing project we have 80 roads with 9 different utilities where we have to give such relations on a go.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
no why do people always want to do things backwards ?
When we want to link several activities of similar type to define a sequence we need to manually link one by one. like FS if we have an option to choose whatever a relation type to be considered as default by the program, we can complete the task simply. In my housing project we have 80 roads with 9 different utilities where we have to give such relations on a go.
Why not defining link type when performing multiple links as a single step?
You can create a filter to display only selected activities when linking activities on a job with many activities to make it easier.
Maybe you did not looked for the option for performing multiple links as a single step within your software, it is not an uncommon task.
Good luck.
I also tried to find this technique. But i came to the conclusion that their is no such way to get SS as default relationship.
bigger question is why ?
no