Productivity rate

Dear Planners,

Can any one provide me with the productivity rate for water pipeline installation in linear meter, bedding and backfilling?

Regards,

Moutaz

N
nadeem Ghulam Qadir 👤 Member for 10 years 8 months

Dear Sir...

Kindly tell me how to calcaulte the planned %  and actual %  and time elapsed of project. with example...

I am waitng  your positive response ..

With Regards

Nadeem

N
nadeem Ghulam Qadir 👤 Member for 10 years 8 months

Dear Planner...

Kindly tell me how to calcaulte the planned %  and actual %  and time elapsed of project. with example...

I am waitng  your positive response ..

With Regards

Nadeem

M
Mike Testro 👤 Member for 20 years 6 months

Hi Moutaz

Next question - Automatic welding - semi automatic welding - hand welding?

Best regards

Mike Testro

M
moutaz aldeib 👤 Member for 22 years 5 months

Hi Mike,

Currently, the dia. are 900mm, 700mm and 200mm, the material is ductile but if you have a sheet contains different materials and dia for the bedding, pipe installation and backfilling, I will be grateful.

Regards,

Moutaz

M
Mike Testro 👤 Member for 20 years 6 months

Hi Moutaz

What diameter - what material - what length - what sub soil.

Best regards

Mike Testro

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts