until you upgrade to P6 R15, you can easlly export baselines:
1. Restore existing baselines (Project, Maintain baselines, Restore): P6 will create a new project from the baseline
2. Export the current project and the restored baseline from Database 1
3. Import the current project and the baseline to Database 2
4. Create the project baseline in the Database 2 by Project, Maintain baselines, Add, the use the option #2
Be aware that P6 R15 no longer allows to update a baseline; as far as I am concerned, this is a considerable downgrade in the software features, and I will reinstall a previous release (8.3 or 7) of the software
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
yes Alexandre you can do that but that was NOT the question
Ali,
until you upgrade to P6 R15, you can easlly export baselines:
1. Restore existing baselines (Project, Maintain baselines, Restore): P6 will create a new project from the baseline
2. Export the current project and the restored baseline from Database 1
3. Import the current project and the baseline to Database 2
4. Create the project baseline in the Database 2 by Project, Maintain baselines, Add, the use the option #2
Be aware that P6 R15 no longer allows to update a baseline; as far as I am concerned, this is a considerable downgrade in the software features, and I will reinstall a previous release (8.3 or 7) of the software
Alexandre
Dear Zoltan Palffy,
Thanks, i will definitely upgrade to R.15
Ali
upgrade to version 15