Hii
It will be grateful if you could answer these
1- How will you prepare Manpower Histogram for Multimillion Projects?
Do you have any standard formats for determining manpower productivity (eg: slab form work= 6 sq.m /day/ carpenter- My company standard).
Pls send me any templates for preparing manpower histograms.
2- How will you prepare S Curve in Primavera ? or is there any tools available to prepare Planned % vs. Actual % Complete in Primavera.?
Hope to see your reply soon.
Email: [email protected]
Mob: +96891198301
S Curve & Manpower Histogram
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
Hi Asif
To prepare your S curve, have a look at Project Tracker. It can create your curve straight from P6 without the need to allocate cost or resource.
You can download a free trial and see what it can do for you at www.willmer.co.uk or email me at [email protected] for more information