Has anyone managed to successfully, fully integrated, a BIM 4D model program to Program Schedule with resource to cost.
Allot of examples demonstrate a 3D model interface with a program using the WBS and Activity codes, hit start and follow a
predetermined time line, following no real construction methodology.
The Model answer Im looking for, will demostrate retrospectively, or prospectively if either the schedule or model has any changes made refelcts a new status, balancing the two.
Kind Regards
Stephen
Hi Stephen,
Is this the sort of thing you mean?:
http://www.astadev.com/wp-content/uploads/2013/07/Buro-Four-Case-Study.pdf
Ben @ Asta
Hi Stephen
I have moved your thread to the new BIM topic.
Hope you get your answers.
Best regards
Mike Testro