recovery plan

Dear All

Need you help our ongoing project was delay and need to prepare Extension of time any sample please for my reference.

Regards
Ron

L
Larry Rino 👤 Member for 18 years 7 months

Hi,

Here's the structure of your recovery plan:

= = = = = = = = = = = = = = Page - 1 = = = = = = = = = = = = = = =  

Project Recovery Plan

Name of Project

Prepared by:

Name of Organization:

Date:

= = = = = = = = = = = = = = Page - 2 = = = = = = = = = = = = = = =  

TABLE OF CONTENTS

1.0 Purpose

2.0 Project Team

3.0 Project Assessment

4.0 Project Recovery Strategies

4.1 - Project Recovery Actions

4.2 - Project Recovery Scheduling

4.3 - Project Recovery Budget

4.4 - Methods for monitoring the project recovery process

4.5 - Necessary tools or information

5.0 Conclusion

= = = = = = = = = = = = = = Page - n = = = = = = = = = = = = = = =  

1.0 Purpose

[Write an introduction for the project recovery plan. State the overall purpose of this document and abriefly describe what is covered within its pages]

2.0 Project Team

[ Provide the names and roles of the project management team members. Describe what responsibilitieseach team member has in regards to the project recovery plan.]

= = = = = = = = = = = = = = Page - n = = = = = = = = = = = = = = =  

3.0 Project Assessment

[What project milestones have been achieved and what has yet to be accomplished? Define the core problems, obstacles, and risks that are preventing or slowing down project completion, and list them inorder of importance, starting with the most critical issues. Include or reference here any risk-related documentation and any other supporting documents that help define these core issues.]

= = = = = = = = = = = = = = Page - n = = = = = = = = = = = = = = =  

4.0 Project Recovery Strategies

4.1 Project Recovery Actions
4.2 Project Recovery Scheduling
4.3 Project Recovery Budget
4.4 Methods for monitoring the project recovery process
5.5 Necessary tools or information

 

= = = = = = = = = = = = = = Page - n = = = = = = = = = = = = = = =  

5.0 Conclusion

[Summarize the project recovery strategies mentioned above as well as the overall goals of the project recovery plan.]

Appendix

[Include any supporting documentation mentioned in the project recovery plan.]

= = = = = = = = = = = = = = Page - n = = = = = = = = = = = = = = =  

 

Hope it offers an idea...

 

Cheers,

Larry R

 


 

T
Toby Hunt 👤 Member for 18 years 10 months

Dear Ron

Any analysis of issues in a construction dispute must be structured in a way that allows an independent party to easily understand the analyst's findings and conclusions.  The case for entitlement to cost and/or time impacts must flow logically and directly from the facts and the contract provisions.  To accomplish this, the analysis must show liability, causation, and damages. There are several steps in the issue analysis process including:

 

  1. performing the preliminary appraisal,
  2. engaging in fact finding, (i.e., compilation of pertinent documents or other records and interviews with key people involved in the project),
  3. applying the contract requirements to the facts to determine responsibility and establish the causal connection between any contract breach or failure to perform and the claimed cost or time,
  4. calculation of any resulting damages or time extensions, and
  5. presentation of  findings in oral or written reports.

Regards

Toby

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts