making sub projects from a parent projects

Hi All,

1.Is it possible to make sub projects froms a parent project for using seperately

2.if it possible can i export it in format ather than excel

For example i have a big project project-1,i want to divide this project in to two, for two sub contractors named sub-1 and sub -2

in xer format for updation

J
John Sims 👤 Member for 15 years

you could take a copy of your master project and then delete the parts you no longer needed, i would say it would be risky doing that though as you may break vital links between the activity.

you would be better by either diving the project within the wbs in to the sub projects you require and filtering on the wbs or assinging activity codes to each activity in your sub project and filetring on those codes.

you can export in msp, excel and various versions of p6. 

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts