Diff between retained logic scheduling / Progressive over ride scheduling / Actual dates scheduling

M
Madhavan R 👤 Member for 13 years 2 months

Hi Planners.

Greetings!

Can any one pls. explin the difference between "Retained logic" / Progressive Over ride / Actual dates scheduling. I came across these terms while scheduling in P6 and could n't find the difference while scheduling the Project.

Thanks in advance.

Reg

Madhavan

D
Dev Tamboli 👤 Member for 19 years

All the optiion will not give you differet results if there is no out of sequence activities in the schedule however if there are out of sequence activities the calculation will be differrent for different options.

 

Retained Logic (RL): The retained logic schedule calculation setting holds schedule logic constant during calculation of in progress schedules.  The calculation adds activity remaining duration in the forward pass calculation for early dates and waits until activity predecessors are completed.

 

Progress Override (PO):  When the progress override schedule calcluation option setting is utilized, Oracle Primavera P6™ignores the predecessor activity relationships and calculates the activity completion date based on its own remaining duration.

  

Actual Dates (AD): When the actual dates schedule calcluation option setting is utilized, Oracle Primavera P6™sets the late finish date of the predecessor activity one day before the actual start of the out of sequence activity. This normally creates negative float to predecessor activities.

A
Abilash Palakkadan Mathew 👤 Member for 13 years 10 months

in retain logic links will be calculated from the early dates regarless of actual dates; but in actual dates option it will be calculated from the actual dates not from early dates

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts