Cost scale on the Y axis.

Here's something that's always irritated; is there a solution?!

When making a S curve or histogram on costs, the Y axis is always graduated at an illogical scale, i.e. if you have £1,301,123  as the max value, it graduates into say a 20% division of the budgeted total rather than rounding up on the scale to say, the nearest £100K. This gives the Y axis a strange look when presented to the team.

Is there a workaround?

D
Daniel Limson 👤 Member for 24 years 7 months

Hi Nick,

If you want a combine Line and Bar Chart, you should have a time/ Increment data and a Time/Cumulative Data

The bar chart or histogram chart using your incremental data should be based on the Primary Axis and the cumulative chart based on a line curve should be based on the secondary axis. You can switch or define the axis by clicking on the bar or line and then format data series.

Cheers,

Daniel

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts