P3e and PDS Model

F
Forum Guest 👤 Member for 17 years 4 months
D
David Dubbelboer 👤 Member for 22 years 9 months

I have seen something similar done with Primavera V3.1 and Bentley Viewer and PDS, or some other modelling tool (I can’t remember exact software package)

All I know is that it exists, or they did it manually, usuing basic modular-type building blocks to give a visual representation for the construction sequence.



A confusing post maybe, but at least I confirmed that it can be done ;-)

S
Shirish Borkar 👤 Member for 21 years 6 months

Hi,



We have tried such thing long back. But it was P3 (Previous version) and AutoPlant software. The requirement was some what similar. I can help you from primavera side (SDK or API), but i dont know PDS.



Following questions can guide you for starting integration:

1. Does PDS allow writing VB macros?

2. Is there any easy way to capture handle (unique id) for object created in PDS? So that you can link handle of PDS object to P3e Activity. After linking these two show activity progress (% complete) on PDS object. Ex. if act percent complete is < 10% and act is critical show object in red color. If activity is between 10-50% then show object in green etc.



Hope this will help you take up the assignment.

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts