Thank you very much. What happened the net connection was very bad and I didn't know if the comment was posted or not because the page is frizzed.
For the answer I got it now and I know how to make the Early start date look same the start date because it was different in one of my company clients schedule.
1) Please only click on the "save" button once when you post, to avoid creating duplicate messages which I have to delete.
2) I'm a bit confused by your question -what are you tryin to change the early start of? What are you trying to make it the same as? Please give an example of what you are trying to do.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
http://www.ronwinterconsulting.com/Understanding_P6_Dates.pdf
Hi Gary,<?xml:namespace prefix = o />
Thank you very much. What happened the net connection was very bad and I didn't know if the comment was posted or not because the page is frizzed.
For the answer I got it now and I know how to make the Early start date look same the start date because it was different in one of my company clients schedule.
Thank you,
Hanson,
1) Please only click on the "save" button once when you post, to avoid creating duplicate messages which I have to delete.
2) I'm a bit confused by your question -what are you tryin to change the early start of? What are you trying to make it the same as? Please give an example of what you are trying to do.