Am I right to say that a high quality report is the one which contains just what the client asks/needs at the moment, or what the analyst wants client to know, or what the analyst thinks client to know?
The details you provide here are master piece for the beginners in this field. So far I believed that a high quality report is the one which is submitted to the courts and boards that contain the history of the case with all the disputes and money matters. Thanx again.
The report system that works for me sets down the story in structured layers.
1. The essence of the dispute
2. The contractual substantiation
3. Description of cause and effect for each delay event with snapshots of the programme embedded in the text with call out blocks to emphasise particular points.
4. Short cogent sentences each sequentially numbered.
5. A simple summary either at the beginning or the end.
What you must not do is:
1. Produce massive charts with colours and arrows all over the place which places all events at once and is the graphic equivalent of a fireworks display.
2. Long protracted paragraphs with rambling sentences.
But actually wanted to know that what is meant by “High Quality” what this report is consist of? I am now planning to move to be an analyst rather than planner. And soon I will get a commercial registration in Dubai, Qatar or may be in Karachi.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Hi, Mr. Testro & Ken
Am I right to say that a high quality report is the one which contains just what the client asks/needs at the moment, or what the analyst wants client to know, or what the analyst thinks client to know?
Cheers
Tanveer
Hi Ken
In my experience it is the low quality reports that stand the most chance of being rubbished - and I am sure we have both seen any number of them.
Best regards
Mike Testro
Hi Ken
Good definition really its covers all. I am very much satisfied now.
Cheers
If your report gets your client what he wants, then it tends to be seen as high quality.
If your report gets blown to pieces then it tends to be seen as rubbish.
Hi Tanveer
Each report must be capable of moving up to an arbitration or tribunal hearing in its own right.
The expert witness may wish to put his own slant on it but if he/she has to make radical changes then it will looses credibility.
There are usually two elements in analytical reports:
1. Time
2. Money
I can do both.
Best regards
Mike Testro
Thanx Mr.Testro
The details you provide here are master piece for the beginners in this field. So far I believed that a high quality report is the one which is submitted to the courts and boards that contain the history of the case with all the disputes and money matters. Thanx again.
Cheer
Tanveer
Hi Tanveer
The report system that works for me sets down the story in structured layers.
1. The essence of the dispute
2. The contractual substantiation
3. Description of cause and effect for each delay event with snapshots of the programme embedded in the text with call out blocks to emphasise particular points.
4. Short cogent sentences each sequentially numbered.
5. A simple summary either at the beginning or the end.
What you must not do is:
1. Produce massive charts with colours and arrows all over the place which places all events at once and is the graphic equivalent of a fireworks display.
2. Long protracted paragraphs with rambling sentences.
3. Say the same thing more than once.
4. Use roman numerals.
Good luck in your new career.
Best regards
Mike Testro
Thanx Mr. Testro,
But actually wanted to know that what is meant by “High Quality” what this report is consist of? I am now planning to move to be an analyst rather than planner. And soon I will get a commercial registration in Dubai, Qatar or may be in Karachi.
Cheers
Tanveer
Hi Tanveer
I would suggest that it may be an Analytical Report that is of High Quality.
I produce them all the time.
Best regards
Mike Testro