Saving MSP 2007 with no blank lines (or activity calendars?) in XML format is working importing to P6 6.2
An IT guru has been working remotely to install stand alone P6 8.2 on my other laptop for the past hour. If he is sucessful I will be able to check out the same import technique on P6 8.2
Can anyone provide on update on comverting mpp files to mpx? Most or the posts on threads are a few years (& verseions) out of date.
When I have to I am using MSP 2007, although some others are using MSP 2010, but mostly working in P6 version 6.2.
I hope to upgrade to the latest (if it still exists) stand alone version of P6 very soon. In the past I have used Pertmaster as a go between, but I don't have it with me on this visit to Nigeria. The net is too unreliable here to run a networked version & besides IT support presents a big risk (also I am old school & like to be IT self sufficient).
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
To at least partly answer my own question....
Saving MSP 2007 with no blank lines (or activity calendars?) in XML format is working importing to P6 6.2
An IT guru has been working remotely to install stand alone P6 8.2 on my other laptop for the past hour. If he is sucessful I will be able to check out the same import technique on P6 8.2
Best wishes to all
Tim
Try
http://www.projectstatus.com/pub/PubFiles/MppToMpx.exe
Good luck.
Can anyone provide on update on comverting mpp files to mpx? Most or the posts on threads are a few years (& verseions) out of date.
When I have to I am using MSP 2007, although some others are using MSP 2010, but mostly working in P6 version 6.2.
I hope to upgrade to the latest (if it still exists) stand alone version of P6 very soon. In the past I have used Pertmaster as a go between, but I don't have it with me on this visit to Nigeria. The net is too unreliable here to run a networked version & besides IT support presents a big risk (also I am old school & like to be IT self sufficient).
Any advise would be appreciated.
Cheers (it's 16:55 on Friday!!)
Tim
See previous thread