Hi
Could please any one help me in set up a profile for productivity?
Assumed we do have a TBM and the ground profile, could be possible to assign TBM productivity based on the ground, so that nay delay will be reflected in the re-scheduling?
If you do have any instruction on how to set this system would be extremly welcome
Cheers
Luca
Hi Guys,
Does anyone have any idea of the standard productivity rate of TBM particularly slurry type TBM?
Regards,
Hi
Tunnel Boring Machine
L
PS
I found the way, using a profile and task with Calculate optio set as Duration-profile
TILOS is a powerfull tools
L
Hi
Tunnel Boring Machine
L
PS
I found the way, using a profile and task with Calculate optio set as Duration-profile
TILOS is a powerfull tools
L
Hi Luca
What is a TBM?
Best regards
Mike Testro