P3 Target bars vs. P6 Baseline Bars
Forum Sponsor
Top Posters
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
[email protected]
Thank u Guys much appreciated :)
James,
if your problem is NOT seeing the secondary baseline bar on the gantt chart.
right click on gantt chart, bars..
click on "second baseline", change the timescale to "secondary baseline" (it is not the default option)
make sure each of the three bars (current, first and second baseline) do not coincide, that is having different rows.
James,
In P6 you have Project assign and maintain baselines.
Assign baseline: you assign the baseline that you would like to show.
Maintain baseline: you CREATE the baselines.
Before working with the bars that you want to display, you must assign the baseline.
ONCE that you have selected the baseline bar, paying attention to the content of columns name and timescale you will get the filter.
It is a predefined filter.
HTH
Cheers,
Oliver:
I did that and still have the same problem. Does the filter used make a difference? Is there something that I am doing wrong when I update the baselines?
James B.
James,
Check Project, Assign baselines and ensure you have the correct baseline assigned as the secondary one.
Also, right click on the gantt, select bars and check that second baseline is ticked and the timescale is secondary baseline.