When we use cost as the standard of split weight in progress control, we found that some work in construction stage spend several days, but it take big part in weight because of cost. When the material procured, we take some actural percentage in progress. But I think it is still difficult to correctly present the progress of construction works.

Anyone knows how to make it better for progress control when we use cost as the weight?

I hope you can share your experience in progress control with me.

Thanks! 

A
Anoon Iimos 👤 Member for 19 years 8 months

what kind of pipe?; inch-dia is number of joint multiplied by diameter of pipe in inch.

@ ji wei, use productivity (man-hours and/or equipment-hours) and backed-up by volumetric calculations (or quantities).

V
VISHNU GUPTA 👤 Member for 14 years 10 months

HI..

ANYONE CAN GIVE DETAILS HOW TO FABRICATE REDUCER FROM PIPE AND HOW TO CALCULATE INCH DIA FOR BILLING PURPOSE

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts