I have a cost loaded baseline schedule that was originally received from the subconstractor is showing a Budgeted Total Cost of $23,835,030. I have received their latest update and the Budgeted Total Cost is $24,613,252. I have assigned the baseline schedule to the lastest update in order to vind where the variances in the ost loaded activities are. When I show the columns in the schedule for the Baseline Total Cost, the value is $24,742,960, not the $24,835,030 as originally established. I am completely baffled as to why this is happening. Does anyone have insight regarding this, or is it a bug in the system?
Baseline costs showing up incorrectly
Forum Sponsor
Top Posters
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts
I have come across this situation on another project. Below is a screenshot of the issue.
[[wysiwyg_imageupload:582:height=314,width=748]]
Hi Sebastian DiBlasi
I do face the same issue ,when i export my program to other system almost 60% of budgeted cost found to be missed