1000 MW Coal based Power Plant Schedule.

M
Mike Testro 👤 Member for 20 years 6 months

Hi Sayed

Did you notice that the original date on this thread was 2006!!!

I am going to lock it now.

Best regards

Mike Testro Moderator.

S
Syed Ali 👤 Member for 18 years 7 months

Hi Prashant,

You looking for sample schedules for 1000MW power plant?

Is it EPC or construction phase? If you go through SOW and drawings you will have what you need.

K
kamesh avasarala 👤 Member for 15 years 8 months

i THINK THERE IS NO 1000MW SINGLE UNIT IN THERMAL POWER IN INDIA . I HAVE 660MW SUPER CRITICAL L2 SCHEDULE IF ANY BODY WANTS I CAN SEND IF YOU HAVE ANY EXAMPLES PLEASE SNED ME IAM DOING 660MW THERMAL POWER PLANT IN INDIA AP.

P
Praves Suppa 👤 Member for 20 years 1 month

Hello,



I experienced for the Combined Cycle Power Plant 2 Stages of 750 MW (EPC). I can give you for a short project case study if you want.



Br

Praves

T
Tu Huynh Van 👤 Member for 19 years 11 months

Hi,



Your Projects are a EPC project or only a Construction phase?



you are Owner’s Scheduler or Contractor’s Scheduler?

A
Armando Moriles 👤 Member for 20 years 7 months

Hi,



1. Is it a single unit 1000Mw Coal Fired Power Plant?

2. Are you working on the overall project schedule from civil to electro-mechanical works?





Arman

Forum Sponsor

Top Posters

Mohammed Netarwala
12 posts
Moahmed
0 posts
S Z
4 posts
Iftikhar Awan P.Eng.
19 posts
ahmad rashidi
4 posts
paulciszewski
0 posts
Catalin Suditu
11 posts
Laraib Fatima
0 posts
Adrian Fletcher
12 posts
GeoVe
0 posts