Problem in P5 when i change "Data Date"
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
Vasilis,
I believed you are looking on the wrong date column. If you used Early Start and Early Finish date then all this date will move when activity is progress. Early start will be changed equal to remaining early start date. Use Start and Finish date which reflects the current date. Actual date is represented by Actual and Finish date columns.
Hi Gents,
The ideal solution is to insert start and finish columns rather than early start or finish dates which will yield only the planned dates as ver 5.0 has got totally different definitions.
Hope this will respolve the problem.
Cheers
Hi
Check the column title since P5 has many dates which can be represented in the activity column section
If the gantt chart dates are correct then check start and finish dates column which should match