How to do resource lag, late date curve in P6.

R
Rafael Davila 👤 Member for 22 years 3 months

Rodel,



Thanks to make it clear, although I do not have P6 is good everyone know the truth, the better all software the better for all of us.



Best regards,

Rafael

R
Rodel Marasigan 👤 Member for 19 years 7 months

Hi Rafael,

It’s also a click of a mouse. On the steps I upload, I explain different technique that the user can used when producing remaining late values, s-curve and histogram.

R
Rafael Davila 👤 Member for 22 years 3 months

Feels like going backwards, when in P3 you could get Early and Late S-Curves with histograms for actual Schedule plus any 2 baselines at a click of the mouse. Is like if software developers forgot it can be programmed, perhaps they feel CPM users must be hurried up by using only early dates.



P3 S Curve

R
Rodel Marasigan 👤 Member for 19 years 7 months

Haresh,

In P3.x resource lag\duration specify the resource to start base on lag time and not on Activity date or duration of resource within the activity.

In P6 it’s become more specific and user can specify the planned start and finish date of each resource on activity when assigned. By default resource use activity planned start and finish date if resource planned start and finish is not specified. If you want to specify the planned start and finish date on each resource on Activity Window-> Resource Tab-> show planned start and finish date column and change the date according to resource plan. Alternatively you can use resource curve and enter the 0 as lag on the beginning of spread to dictate resource on when to start.



Driving resource by default is tick on Project Window-> Resource tab which can be edited or un-tick on Activity Window-> Resource tab-> show column Drive Activity dates. It works only on Resource dependent activity type with the combination of Fixed Unit or Fixed Unit/Time duration type. If this setting is imported to P3.x, resource will be imported as driving and if Fixed Duration and Units or Fixed Duration and Unit/Time is used it will imported as non-driving in P3.x



In regards to remaining late s-curve I uploaded to snip for your reference on how to produce remaining late spreadsheet values, s-curve and histogram on link below.

Remaining Late spreadsheet Value, S-Curve and histogram

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts