EPS sometimes shows summary blank

R
Rodel Marasigan 👤 Member for 19 years 7 months

Haresh,

Like Activity Window (module), Project Window (module) also having schedule (F9) equivalent. The proper practice is to run an update every cut-off like what you do in your Schedule. The schedule (F9) equivalent for EPS/WBS is called Summarize. (Tools-> Summarize (any of the three option – Open Projects, All Projects Summary only Projects) If you haven’t run summarize then all information on the Project that not open will show nothing but once you run the summarize it will update the information whether open or not depends on your settings (Project Window-> Settings tab-> Summarize data. You can specify the WBS level to summarize and level of detail for resource planning). You can also run an automatic update using Job Services.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts