Back up Mutilple Projects in P6

R
Rodel Marasigan 👤 Member for 19 years 7 months

James,

Just pick the main EPS and export to xer if all are sitting in one main EPS otherwise you need to highlight all main EPS and export to xer.



Alternatively you can manage and backup the whole database using SQL Server Management Studio Express if installed on your PC. (Included on Primavera installation CD)

R
Rafael Davila 👤 Member for 22 years 3 months

Backup the MM and PM databases in this way you will not lose Enterprise Data.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts