How can change the date display type in P3.

M
mch 714 👤 Member for 18 years 1 month
M
mch 714 👤 Member for 18 years 1 month

Hi Robin,

In P3, Click Format>Dates and only appeared the date format for Arabic numerals(21-3-2010), but not had that I need type (21-mar-2010)on months.

R
Robin Reyes 👤 Member for 19 years 8 months

In P3, Click Format>Dates and then Select the date format you want.

M
mch 714 👤 Member for 18 years 1 month

Hi Mike,

Sorry! I wrote the status is in primavera - P3.1 Verson. whether is same changing on the default system of windows XP? I already try so doing but not change together with system of windows XP.



Best regards



Mch714

M
Mike Testro 👤 Member for 20 years 5 months

Hi Mch



It is old software so the numeric system applies - you are lucky to get 2010 visible.



In Powerproject version 5 - some time ago - the date format was linked to the default windows set up but now you can set it to whatever configuration you want.



Best regards



Mike Testro.

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts