Hai

Thanks all for ur reply.Actually I am getting Budget unit similar to BOQ.

My main Problem i am not able to get the Budget Cost in S Curve similar to Activity table

If i Run Recalculate Assignment Cost Total Budget Cost getting change

Once Again if i run Global Change i am able to get Correct Budget Cost in activity table any in my S Curve the Problem remain same

Is there any option to fix it

Regards

Anbin

A
Andrew Podolny 👤 Member for 21 years 7 months

P6 database is designed to hold up to 8 decimal points in some cases (cost_per_qty for instance is NUMERIC(21,8)) but the P6 interface allows you to see only 2 decimals.



Regards,

Andrew

I
Izam Zakaria 👤 Member for 20 years

Yeah i guess everybody confront the same problem. This happen too at Primavera 3. So what u need to do just play around the figure.

D
D Artagnan 👤 Member for 17 years 8 months

Anbin,



It’s because of the rounding up the figures. Pro’ly, the data that you imported have more than 3 decimal places but P6 can only accomodate 2 decimal places. What P6 does is round it up accordingly.

M
Mike Testro 👤 Member for 20 years 6 months

Hi Anbin



Sounds like a rounding up / down error.



Make sure that the two data sets are set to the same decimal places.



Best regards



Mike Testro

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts