importing from MSP2000 to P6

R
Rangarajan Ramaswamy 👤 Member for 16 years 6 months

yeah ur right,actually i joined the project in the middle,thats y so much confusion.also i have got one more issue , i have primavera installed in my comp. along with mssql (i use it at office) , and i have primavera installed along with oracle in my laptop,can i access my comp database from my laptop when we are on the same network.

M
MK TSE 👤 Member for 24 years 3 months

Any link to group heading on MSProject is not recommended. For good practice on network, the link should establish among activities, not any group heading (Group heading is summary only)

R
Rangarajan Ramaswamy 👤 Member for 16 years 6 months

Thankx for the reply, but i linked many activities to WBS summary in MSP and now after importing to P6 i cannot delete all the summaries as it is a hige database more than 3k activies and links, i need help while importing,also can i have ur gmail id so that i can be in touch with u as m nu to P6.

Thankx for the concern though

TC

M
MK TSE 👤 Member for 24 years 3 months

When import, P6 auto create a activity (in acctivity WBS Summary) for each heading row in MSP.

Either change the import option or delete all "WBS Summary" activity type activities will solve the problem

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts