Yes... I know that it is possible in MP2003 but...i used MP2007...i refer to Programmed S-Curve..to the initial proyection of how the s-curve must be run agree the initial plan. The curve against we compare the curve of execution.
I hope that you understand my question...cause i dont have a lot of practice in my english.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Jhorbam,
In MS Project 2007, you will use Visual Reports; it does replace MS Project 2003s "Analyze Timescale Data in Excel".
Alexandre
S Curve comes in different flavours.
Its a graph, it has axes, you have to know what you want on them.
Time is on the horizontal axis.
What do you want on the vertical axis, Cumulative Cost or Work?
You can get Cumulative Cost and Cumulative Work at Reports, Visual Reports.
Yes... I know that it is possible in MP2003 but...i used MP2007...i refer to Programmed S-Curve..to the initial proyection of how the s-curve must be run agree the initial plan. The curve against we compare the curve of execution.
I hope that you understand my question...cause i dont have a lot of practice in my english.
Thanks
When you say "s-curve", you mean Cumulative Cost or Cumulative Work?
Either one, in MSP2003 View, Toolbars, Analysis Toolbar and then the "Analyse Timescaled data in Excel" button, then follow the wizard.