Irrigation Steel Water Tank

S
Samer Zawaydeh 👤 Member for 17 years 10 months

Dear Anbin,



Please provide a copy to your construction team as well. You need to talk to them about the details and the sequence of work. They will have to build it for your. So, their opinion is a major criteria in the successful achievement of the Program of Works.



With kind regards,



Samer

S
Samer Zawaydeh 👤 Member for 17 years 10 months

Dear Anbin,



Please provide a copy to your construction team as well. You need to talk to them about the details and the sequence of work. They will have to build it for your. So, their opinion is a major criteria in the successful achievement of the Program of Works.



With kind regards,



Samer

S
Samer Zawaydeh 👤 Member for 17 years 10 months

Dear Anbin,



Please provide a copy to your construction team as well. You need to talk to them about the details and the sequence of work. They will have to build it for your. So, their opinion is a major criteria in the successful achievement of the Program of Works.



With kind regards,



Samer

A
Anbin Ponnith 👤 Member for 17 years

Dear Samer,



Thanks a lot.I have submitted the program with all ur suggesions and remarks,,





With Thanks & Regards,



Anbin Ponnith

S
Samer Zawaydeh 👤 Member for 17 years 10 months

Dear Anbin,



This is a good start.

Please add the following at the start of the program:



1. Material submittals.

2. Shop drawings submittals.

3. Method Statements

Safety Plan

Erection Plan

4. Quality Records

Inspection and Testing Plan

Certification of Welders

Welding Procedures

5. Procurement: you need to mention the arrival of material at site.

6. At the end of the program you need to mention the Testing and Commissioning and Handing over to client.

A. "As Built" drawings

B. Quality Manual; inspection records, MTCs, Welding Maps, Test results.



7. Please show the installation of the Achor Bolts as an independent activity, because it will be handed over to client.

8. Have a look at the Electromechancial requirements of the project and make sure that you include them all.

9. Check the inspection requirements at site and include then in yoru construction sequence.

10. Check what is the height of the tank and how many plates you have and show them as levels in your construction sequence.



With kind regards,



Samer

A
Anbin Ponnith 👤 Member for 17 years

Thanks Samer,



I have to submit the initial program to the client,



I have prepared in this way,

Irrigation Water Storage Tank 58 m Dia.



I.Sub Structure

Excavation & Compaction

ATT & Vapor Barrier

Blinding

Footing Rebar & Shuttering

Pour for Footing

Ring wall Rebar & Shuttering

Pour for Ring Wall

Water proofing

Backfilling

Cathode Ribbon & Conductor Bars

II.Super Structure

Laying of Bottom plate

Erection of Structural Columns

Erection of Girders

Erection of Rafters

Erection of Shell

Erection of Roof

III.Finishers

Erection of Staircase & ladder

Fixing of Nozzles

Cathodic Protection

Fixing of Accessories

Painting.



Please give me comments,



With Thanks & Regards,



Anbin Ponnith

S
Samer Zawaydeh 👤 Member for 17 years 10 months

Dear Anbin,



The following activities will help you with Building your schedule:



Site Activiites:

I. Substructure

Excavation

Blinding

Shuttering of Raft

Reinforcement of Raft

Anchor Bolt Setting

Casting of Raft



II. Super Structure

Erection of Steel Base

Welding of Plates (Level 1, 2, 3, etc)

Testing of Welds

Mechanical Fittings

Testing of Mechnical Fitting.

Electtrical installation.

Painting of Structure.

Installation of circulat ladders and handrails



III. Roof Installation

Scafolding or Lifting depending on the type of Roof.

Installation of circulat ladders and handrails

Testing of Welding

Painting



It would be highly recommended that you read the specifications, BOQs and Plans and include all the scope of work that you have in the Schedule of Work. Come up with a draft and show it to your team members, they will correct it and update you with the correct activities and sequence of works.



With kind regards,



Samer

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts