Further to the answer supplied by Rubas, you can also adjust the row height much the same as you would in Excel.
Select the row, move the cursor over to the ID column on the left-hand side of the Task Entry table until it changes to a double ended arrow with a line through the middle of it. Then just left-click on the horizontal separator and drag the mouse down until you reach the desired height.
Alternatively you can also change the font size of the task description, as this is how the minimum row height is determined.
Right click on the gantt chart>Layout>Bar Height. The maximum bar height is 24. However if you need to further increase the row height, you can do so by increasing the font size (and then hide it)
It is possible to insert the text box by View>Toolbars>Drawing & then by dragging the text box onto the gantt chart. You can then position this text box by right clicking on Text Box>Properties>Size & Position. Youve the option to attach this either with the Timescale or any specific Task.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Hi Mukunda,
Further to the answer supplied by Rubas, you can also adjust the row height much the same as you would in Excel.
Select the row, move the cursor over to the ID column on the left-hand side of the Task Entry table until it changes to a double ended arrow with a line through the middle of it. Then just left-click on the horizontal separator and drag the mouse down until you reach the desired height.
Alternatively you can also change the font size of the task description, as this is how the minimum row height is determined.
Regards,
Darren
Hi Mukunda
For adjusting row height:
Right click on the gantt chart>Layout>Bar Height. The maximum bar height is 24. However if you need to further increase the row height, you can do so by increasing the font size (and then hide it)
It is possible to insert the text box by View>Toolbars>Drawing & then by dragging the text box onto the gantt chart. You can then position this text box by right clicking on Text Box>Properties>Size & Position. Youve the option to attach this either with the Timescale or any specific Task.
Kind regards