number of days/Productivity norms

V
Vrinda M 👤 Member for 18 years
G
Gary Whitehead 👤 Member for 17 years 2 months

Milinde made this offer 4 1/2 years ago. I'm locking this thread to avoid any more "me too" replies.

M
Muthukumar Santhanam 👤 Member for 12 years 10 months

Dear Mr.Milind Pandhare,

Sir, I am in need of producivity norms of equipments includes excavator, Dozers ,Showel ,Graders, transit mixers, rock breaker, rollers and cranes , other civil equipments .

producivity norms of civil manpower and structural manpower includes carpenter,fitter, mason, steel fitter,welder, rigger, all helpers. Pls send xcel format if you have ...,,,,

M
Muthukumar Santhanam 👤 Member for 12 years 10 months

Dear Mr. Milind Pandhare,

Sir, I am in need of producivity norms of equipments includes excavator, Dozers ,Showel ,Graders, transit mixers, rock breaker, rollers and cranes , other civil equipments . 

producivity norms of civil manpower and structural manpower includes carpenter,fitter, mason, steel fitter,welder, rigger, all helpers. Pls send xcel format if you have ..........  

S
SUNIL THYPARAMBIL ABDUL SALAM 👤 Member for 12 years 6 months

Dear all,

Could any one have productivity norms for earthworks substructure activities shoring,piling,earthworks including storm line, sewer line, low voltage medium voltage etc. Please forward me to my email id at (use private message service)

Regards,

Sunil

V
Vrinda M 👤 Member for 18 years

Thanks,Milind,



My email is [email protected].



Also I wanted some more info.....



There is a G+1 office building...

where GF is insitu slab



but 1f & roof slabs are Post-tensioned slabs...



What will be the construction for 1F & roof slabs,corewall etc in my programme as for Gf-Shuttering,Rebar,Concrete...

Please advise on P.T slabs...





Thanks,

Vrinda


M
Mike Testro 👤 Member for 20 years 5 months

Hi Milind



You should use the PP message service for this type of contact so send your email address to vrindra by that route.



Otherwise you will be subject to the usual feeding frenzy of "me too please".



Best regards



Mike Testro

M
Milind Pandhare 👤 Member for 20 years 9 months

Dear Vrindra ,

I have one excel sheet with

the Output rate for Excavators (Different Model )

Dozers ,Showel ,Graders sort of Earthwork Machinary

thease output rates are for Gulf region

email me on

..............

i will send you that file

A
A D 👤 Member for 19 years

It depends on how many excavators u want to deploy and what is ur contract duration. Howver, as a thumb rule, if u r doing excavation for a trench and location is within UAE, then with a normal excavator of 0.5m3 bucket capacity, we consider 28m3/hr as standard productivity rate.



Check the drawings first. If depth is more, then apply some efficieny factor too.



You may please get book on Construction equipment management by peurifoy to study further. (Approx. AED 550/-)



Dewatering depends on the water table. Ur Consultants must have carried out geotechnical investigation. Get the report and check the water table and compare with ur drawings.

V
Vrinda M 👤 Member for 18 years

I would like what is the amont of bulk excavation carried out per day,In this forum under the rates bulk excavation given as %.The total bulk excavation 14000 m3 how many days it would require.



Also please advise on dewatering,shoring whn it is carried out and hw many days it takes depending on which factors???





Thanks fr ur help

Vrinda

A
A D 👤 Member for 19 years

It’s all there under the rates section in this forum.



If u want anything else, plz do let us know



Ravi

M
Mike Testro 👤 Member for 20 years 5 months

Hi Vrindra



Its not just the capacity of the digger - its also the haul away rate that has to be calculated.



This depends on:



Nr and capacity of the haul trucks - allow about 10% for bulking.



Haul disnce in Km * 2 for return * kph = turn round time



+ 10 mins each for load and tip = m3/hr for haulage.



This should be marginally shorter than the digger output so you have one truck waiting.



Best regards



Mike Testro

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts