Thanks Dieter......... It works;)
SAP
Yes it is. Access rights are inherited through the EPS-structure (EPS --> Project --> WBS).
Have a look at "Responsible Manager" and "Security Profiles (Project)" in the manual or the help-function.
Hope this helps
Dieter