I am glad the reference I obtained from this forum helped.
Regarding the import resources to P6 issue here I cannot help you as we do not use P6. We use Suretrak as the 10,000 limit on activities is enough for our needs.
nevertheless the issues are the same/similar.
I have successfully imported resources into Suretrak with this utility without the need of any additional steps.
I am sure someone else in this forum will pick up the issue and help you out.
I use this utility to import mpp files to Suretrak, I do not have any other Primavera Software as all my clients do use Suretrak. At previous job locations I had network access to old reliable P3, also access to unreliable P3e which after many attempted upgrades is now called P6 (don’t know if still unreliable) so there is no way I can try the conversion with these other Primavera applications. Beware no way file conversions will be 100% complete/reliable, use it once then keep using your Primavera Software.
I unstalled the MSP from my computer and tried importing the MPX file but it is showing error. i will explain step by step
1) i converted MPP file to PPR, doing this The activities having relationship with FF has not exported in PPR format (Activities are visible but relationship disappear in PPR format)
2) i export PPR file to MPX file, all duration becomes zero
3) i try importing this MPX file to P6, it shows me error (while Importing) "an application event has intercepted please note the event code for reference"
EVENT CODE PRMDB-1922-5
i dont know wat is going wrong, can u please help me
i convted MPP file to MPX, Then i import it to P6 (stand alone),while importing i get the following error
Event code PRMDB-1922-5
after this error when i go to see (in project window) wether the import has taken place or not, the imported project is reflected there but when i click on it to open,it shows me the error
"WBS was deleted by another user"
and the project disappears from the EPS (Project windows)
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Sanjay
I am glad the reference I obtained from this forum helped.
Regarding the import resources to P6 issue here I cannot help you as we do not use P6. We use Suretrak as the 10,000 limit on activities is enough for our needs.
nevertheless the issues are the same/similar.
I have successfully imported resources into Suretrak with this utility without the need of any additional steps.
I am sure someone else in this forum will pick up the issue and help you out.
R. Davila
Thanks Davila
i have downloaded the MPP to MPX converter as u said. the project got exported and i did all corrections for relationship.
but when i am importing the resourses (from excel to P6) it shows me error and none of the resourses get imported.
can u help me out..???
thanks
sanjay
Did you tried with the conversion utility by Primavera MppToMpx.exe?
You can download it from the following link previously posted under another but similar topic. http://www.projectstatus.com/pub/PubFiles/MppToMpx.exe
I use this utility to import mpp files to Suretrak, I do not have any other Primavera Software as all my clients do use Suretrak. At previous job locations I had network access to old reliable P3, also access to unreliable P3e which after many attempted upgrades is now called P6 (don’t know if still unreliable) so there is no way I can try the conversion with these other Primavera applications. Beware no way file conversions will be 100% complete/reliable, use it once then keep using your Primavera Software.
sanjay,
I should have stated yesterday: what MSP files format are you importing int PM6? MSP 2003 or MSP 2007?
can you send one of your files to [email protected] for me to test?
Alexandre
Hi Alex
I unstalled the MSP from my computer and tried importing the MPX file but it is showing error. i will explain step by step
1) i converted MPP file to PPR, doing this The activities having relationship with FF has not exported in PPR format (Activities are visible but relationship disappear in PPR format)
2) i export PPR file to MPX file, all duration becomes zero
3) i try importing this MPX file to P6, it shows me error (while Importing) "an application event has intercepted please note the event code for reference"
EVENT CODE PRMDB-1922-5
i dont know wat is going wrong, can u please help me
sanjay
Hi Alex
yes i do have installed MSP2007 & P6 on same system
i will try unstalling MSp2007 & then export the MPX tp P6.
will let u knw later
thanks
sanjay
sanjay,
are you using PM6 and MSP 2007 on the SAME computer?
MSP 2007 is the worse PM6 ennemy; you wont be able to import MPP or MPX files into PM6 until you uninstall MSP 2007
Alexandre
Hi moutaz
i am using P6
Sanjay
Hi Alexandre
i convted MPP file to MPX, Then i import it to P6 (stand alone),while importing i get the following error
Event code PRMDB-1922-5
after this error when i go to see (in project window) wether the import has taken place or not, the imported project is reflected there but when i click on it to open,it shows me the error
"WBS was deleted by another user"
and the project disappears from the EPS (Project windows)
i am using MSP 2007, Windows vista (1st laptop)
MSP 2003,Windows XP (2nd laptop)
Sanjay
sanjay,
please advise: windows version (xp, vista?), msp version (2003, 2007?), pm6 error: what does it say?
cheers,
Alexandre
Hi Moutaz
i am using P6.
when i import the MPP file, it gives me error.
kindly tellme step wise step how to proceed.
thanks
sanjay
Hello,
Open P3, tools, MPX conversion utility, convert an MPX project to P3
Regards,
Moutaz